Munich Allianz arena boasts zenOn HMI/Scada system
The ultra-modern Munich Allianz Arena stadium is a perfect example of how to manage and experience football events in the 21st century. In the stadium, fans experience the bristling atmosphere with great comfort, supported and informed by the latest high-tech building automation coordinated by the zenOn HMI/Scada system. In 2006, the Munich Allianz Arena is hosting the most significant event in the football calendar.
Over 60,000 guests already experienced how well prepared it is for this job from the opening on May 31 2005 – since then hundreds of thousands more fans have visited.
zenOn software was selected to visualise and control the entire project.
zenOn is a Windows platform, independent, open control system with over 250 connections to diverse PLC, control and hardware components developed in-house.
Seamless organisational operations for a game are easily pre-programmed on a single PC.
The operator simply enters the time and date into a wizard, and all the required automations are implemented.
Source and more info: processingtalk